We're Taking Bookings!
Although the last touches are being added, it's all cosmetic and we're opening the studio at an introductory rate until September.
Finishing Touches
Nearly done! Okay actually there is still lots of things to do before we can say it's "finished", but it's mostly cosmetic
Centre Table
The control room floor is finished, the light boxes are in, and we have hung the ceiling cloud in there too. One of the last things in...
Wood Flooring
So the wood floor is in the control room is going down and it's going surprisingly well. Considering there isn't a carpenter in sight, we...
Final Electrical Fit-Out
The final stages for the studio electrics are underway and our electrician is hard at work installing our sockets, switches, and lights....
Miscellaneous Malark 2
It feels like we're in the final stages of this project and we've put our hearts and souls into it, a labour of love, a huge learning...
Studio Windows
The studio walls and doors are complete and we had to make sure the the specification of the window was going to maintain the integrity of t
Plastering?
Nahh, we don't need to plaster the whole room. It's very costly and time consuming. Instead we're going to tape the joints and cover it...
The Soundproofing System
The construction of the live room in the studio involves a more complex soundproofing system than in the control room. As we only have a...
Fitting The First Door
We were nervous about fitting the doors, but the first one couldn't have gone better. It's all about making sure the frame that the