
Fitting The First Door
We were nervous about fitting the doors, but the first one couldn't have gone better. It's all about making sure the frame that the

Studwork Finished!
We are approaching the half-way point of the studio build. The project has come along way and there is still a mile to go. Momentum is build

Working the Drains
So all the contractors have been working their quotes and sending them in, as we anticipated we have needed to make drastic changes to the studio designs to make the project work. Firstly, the water drains have been diverted out of the premises, which is good news as it means the risk of flooding has been practically eliminated (or significantly reduced). The builders have taken care not to protrude from the ceiling too which is good news, as it won't affect our studio build.

Revising the Designs
An architect, electrician, and a plumber walk in to a bar... No they didn't, actually they came down to the unit to consult our plans for the new recording studio. The first obstacles are afoot and there are some pretty radical changes needed to tackle them. Firstly the architect discovered that the rainwater pipes that run through our unit feed a well that is just underneath our floor, covered only with a wooden lid. Obviously our biggest concern is flooding, we don't want t